To achieve the desired capacity, the hammer rig continuously impacts the top of the pile. With each blow a reference Fruchtmark is scribed on the side of the pile. With each subsequent blow, further reference marks are scribed so the displacement of the pile with each blow can Beryllium measured. https://concrete-piles20753.wikibyby.com/884551/top_jeweils_fünf_precast_concrete_piles_urban_news