Ken Mattingly was moved with the support crew into parallel education with Anders as backup CMP in case Apollo 11 was delayed earlier its intended July launch date, at which position Anders could be unavailable.[fifty nine] Upon arrival with the Vertical Assembly Making, Each individual stage was inspected inside https://holdenqqnol.timeblog.net/63486029/considerations-to-know-about-ambiq-semiconductor